Output component
Confirm what case making & inner laminating lines must deliver to the next production operation.
Case Making & Inner Laminating Lines. Compare the production step before selecting a machine family.
A case making and inner laminating line decision starts with the real product, complete format range, material specification, accepted-output target and the operation that receives the result.

These supplied equipment images support process discussion. Confirm the exact model revision, guarding, options and configuration in the current written offer.



Image source: materials supplied for this project. Product, machine and facility identity must be confirmed against the current quotation before making a contractual claim.
Use the values below for initial screening. Final fit requires the current technical offer and an actual-material sample trial.
Catalogue speed is a published machine range, not a promise of accepted production output. Product format, material behavior, changeover and inspection criteria must be tested.
| Model | Maximum / minimum size | Catalogue speed | Positioning | Power |
|---|---|---|---|---|
| QZFM-700K | 450x700 / 100x200 mm | 20-30 pcs/min | ±0.2 mm | 30 kW |
| QZFM-1000K | 600x1050 / 140x240 mm | 20-30 pcs/min | ±0.25 mm | 34 kW |
| QZFM-700B-II | 450x700 / 100x200 mm | 20-35 pcs/min | ±0.1 mm | 30 kW |
| QZFM-1000B-II | 600x1050 / 140x240 mm | 20-30 pcs/min | ±0.1 mm | 34 kW |
| QZFM-700B | 450x700 / 100x200 mm | 20-30 pcs/min | ±0.1 mm | 42 kW |
| QZFM-1000B | 600x1050 / 140x240 mm | 20-30 pcs/min | ±0.1 mm | 42 kW |
Source: HORDA 2026 equipment catalogue supplied for this project. Confirm the latest machine revision before ordering.
Use these checks to keep the case making and inner laminating line discussion tied to measurable inputs, outputs and responsibility boundaries.
Confirm what case making & inner laminating lines must deliver to the next production operation.
Check minimum, maximum and frequent jobs instead of one nominal case making and inner laminating line format.
Judge case making & inner laminating lines by consecutive accepted pieces, not maximum catalogue speed alone.
The six items below reduce assumptions when evaluating case making & inner laminating lines and make competing technical offers easier to compare.
Keep the same product definition, material set and acceptance method throughout the case making and inner laminating line trial, quotation and order.
Use the answers as a starting checklist and confirm project-specific statements with current technical evidence.
Start with the output component, flat size range, material set, registration need, job mix and the next production operation.
No. Accepted output, changeover, minimum format, process quality, labor and line balance can be more important.
Provide samples, flat drawings, material details, size range, target output, electrical standard and desired supply scope.
Often yes, but interfaces, heights, buffers, control responsibility and acceptance of the combined line must be reviewed.
Primary topic: case making and inner laminating line. This page remains excluded from search while its facts, images and application proof are under review.
Continue from case making & inner laminating lines to the most relevant equipment, process, application or buyer-information page.
Send the finished product, flat drawing, materials, size range and target output.